Port of the Islands Seawall Repair & Permits

For this mainland waterfront east of Marco Island, use the county marine permit process and verify the actual loading and working route with the contractor.

Describe your project on this page ↓
Port of the Islands waterfront mapNorth is up. The accent marker identifies the selected community. Choose a community label to open its local guide. Nearby guide links also appear below the map.Port of the IslandsPort of the Islands waterfront mapNorth is up. The accent marker identifies the selected community. Choose a community label to open its local guide. Nearby guide links also appear below the map.Port of the Islands
Official GIS reference data. Marker: documented road reference, not a service address or neighborhood boundary.

Get to know your waterfront

Collier Parks lists Port of the Islands Marina at 525 Newport Drive, with an oversized single ramp and a 94-space parking facility. Those details locate a public access resource; they do not reserve it for a construction project. The Rookery Bay management plan discusses the Faka Union Bay watershed in the wider regional estuary. Establish the particular parcel, waterway route and proposed shoreline activity before assuming that island-city rules or access costs apply here.

Port of the Islands Marina · Rookery Bay reserve management plan 2022–2027 · County commercial vessel launch permits · Collier County Marine permit — PRMAR · Collier County marine submittal requirements

Connect the wall investigation with the proposed waterward work

Have the professional describe the visible and underwater components included in the assessment. A diagnosis should identify the actual failure mechanism and the parts that remain concealed, rather than borrowing assumptions from a Marco Island canal job.

For a replacement, rock protection or changed footprint, show the existing shoreline and proposed work on the signed and sealed site information required by the county. Include mangroves and the equipment route in the questions sent to DEP South District.

What could the work cost?

Budget county fees separately from the construction quote. Ask whether the price assumes use of the public marina ramp, another loading point or upland access, and who confirms that the proposed commercial activity is allowed.

Published regional starting prices. Get a written quote for the work at your property.

Compare quotes and plan a budget →

Find the relevant permits and records

Port of the Islands researched starting points
Starting pointWhat to resolvePrepare and look up
Collier County · Marine PRMAR
Verify parcel jurisdiction and the complete marine scope.
Parcel identification, signed and sealed site plan, relevant construction plans and existing approvals.
DEP South District
Ask about environmental authorization, submerged lands and vegetation for this work.
Site plan, photos, equipment route and proposed waterward work. Call 239-344-5600.
USACE · Fort Myers
Confirm federal review for the proposed waterfront activity.
Describe location, dimensions and the complete work footprint. Call 239-334-1975.

Prepare the questions for the responsible office.

Port of the Islands: the practical checklist

Use these checks to turn the location into a defined scope and a clear question for the responsible professional.

  1. Start with Marine PRMAR

    Provide the parcel identification and complete seawall, dock, lift or demolition scope. Ask Collier which plans and related permits are required.

    Collier County Marine permit — PRMAR · Collier County marine submittal requirements

  2. Verify the marina’s actual role

    The facility inventory lists a ramp and parking, but does not grant construction staging. Confirm vessel dimensions, loading use and commercial-launch permission with the operator.

    Port of the Islands Marina · County commercial vessel launch permits

  3. Bring the environmental questions together

    Show vegetation, proposed waterward placement and the equipment route to DEP; ask USACE Fort Myers about the federal review for the same scope.

    Rookery Bay reserve management plan 2022–2027 · DEP mangrove questions · DEP South District Permitting · USACE regulatory office locations

Start with what you know

Organize your Port of the Islands project

Keep the parcel location, observed changes and available records with your project notes. When you send the form, we pass your request to a local marine contractor.

Help understanding your seawall, exploring repair options and finding the right next step.

Getting your form ready…

Port of the Islands project questions

Do Marco Island city seawall fees apply here?

Do not use the city schedule for a county project. Verify the parcel authority and obtain the county’s fee assessment for the proposed PRMAR application.

Collier County Marine permit — PRMAR

Does an oversized public ramp mean a work barge can use it?

The published facility description is not a vessel or construction-use authorization. Confirm the actual operation, dimensions and commercial-launch requirements before pricing mobilization.

Port of the Islands Marina · County commercial vessel launch permits

Keep planning

Nearby waterfront guides

Goodland, Isles of Capri

View the local guide directory.

Show sourcesHide sources
  1. Port of the Islands MarinaSource reviewed 2026-10-25 · official indexed text
  2. Rookery Bay reserve management plan 2022–2027Source reviewed 2026-10-25
  3. County commercial vessel launch permitsSource reviewed 2026-10-25 · official indexed text
  4. Collier County Marine permit — PRMARSource reviewed 2026-10-25 · official indexed text
  5. DEP South District PermittingSource reviewed 2026-10-25
  6. DEP mangrove questionsSource reviewed 2026-10-25
  7. USACE regulatory office locationsSource reviewed 2026-10-25 · official indexed text
  8. Marco Island Seawall Owner’s Manual (April 2014)Source reviewed 2026-10-25
  9. Historical city seawall code packet (2018)Source reviewed 2026-10-25
  10. City seawall permit application — Form 31Source reviewed 2026-10-25