Help with your seawall project·Marco Island
Collier Bay · Your waterfront project

Collier Bay Seawall Repair & Access Planning

On Collier Bay, connect the structural scope to the vessel route. The city bridge brochure identifies North Kendall Drive as a crossing; the contractor must check the route for the exact property.

Describe your project on this page ↓
Collier Bay waterfront mapNorth is up. The accent marker identifies the selected community. Choose a community label to open its local guide. Nearby guide links also appear below the map.Collier BayHideaway BeachTigertail & Clam BayCollier Bay waterfront mapNorth is up. The accent marker identifies the selected community. Choose a community label to open its local guide. Nearby guide links also appear below the map.Collier BayHideaway Beach
Official GIS reference data. Marker: documented road reference, not a service address or neighborhood boundary.

Get to know your waterfront

Collier Bay appears on the city’s comprehensive-plan map series on the northern side of Marco Island. The bridge reference identifies North Kendall Drive at the bay, but a neighborhood label does not tell you which bridges a particular canal route uses. Trace the route from the intended launch or loading point to the wall. Keep dock projections, vessel turning room and proposed toe protection in the same discussion.

Marco Island comprehensive plan and map series · Marco Island bridge and waterway reference · City bridge locations and clearance brochure · Marco Island Seawall Owner’s Manual (April 2014) · City seawall permit application — Form 31

Include the underwater support and usable dock space

Ask whether the assessment can inspect the submerged toe and the wall behind existing dock components. The city manual describes support loss at the toe and notes that rock protection takes water space. A proposal should show what is being repaired and what space the finished work occupies.

If a barge is needed, have the contractor verify the vessel’s loaded dimensions against the actual route. Published bridge readings are not a clearance guarantee.

What could the work cost?

Compare the price for a defined inspection and access plan. A rock allowance, dock alteration or second mobilization can change the total even when the wall length stays the same.

Published regional starting prices. Get a written quote for the work at your property.

Compare quotes and plan a budget →

Find the relevant permits and records

Collier Bay researched starting points
Starting pointWhat to resolvePrepare and look up
Marco Island · Building Services
Confirm Form 31 scope, current fees and required related permits.
Address, survey, lot and waterway widths, engineered drawings and staging description. Call 239-389-5059.
DEP South District
Ask about environmental authorization, submerged lands and vegetation for this work.
Site plan, photos, equipment route and proposed waterward work. Call 239-344-5600.
USACE · Fort Myers
Confirm federal review for the proposed waterfront activity.
Describe location, dimensions and the complete work footprint. Call 239-334-1975.

Prepare the questions for the responsible office.

Collier Bay: the practical checklist

Use these checks to turn the location into a defined scope and a clear question for the responsible professional.

  1. Trace the North Kendall question

    Use the bridge brochure to identify the relevant crossing, then have the operator verify the actual route, opening and water level.

    Marco Island bridge and waterway reference · City bridge locations and clearance brochure

  2. Measure the waterfront together

    The city asks for lot and waterway widths. Include the dock, lift and any proposed rock footprint in the designer’s site information.

    City seawall permit application — Form 31 · Marco Island Seawall Owner’s Manual (April 2014)

  3. Close the work with a survey

    Retain the NAVD88 cap elevation and wall position on the completion survey rather than relying on a measurement from the water.

    City seawall permit application — Form 31

Start with what you know

Organize your Collier Bay project

Keep the parcel location, observed changes and available records with your project notes. When you send the form, we pass your request to a local marine contractor.

Help understanding your seawall, exploring repair options and finding the right next step.

Getting your form ready…

Collier Bay project questions

Does every Collier Bay job pass under North Kendall?

No. The brochure identifies that crossing; the actual approach depends on the parcel and mobilization point. Have the contractor trace the complete route.

Marco Island bridge and waterway reference

Is riprap always the cheaper repair?

No local price comparison is established here. First determine whether toe protection addresses the diagnosed condition and fits the authorized waterfront space.

Marco Island Seawall Owner’s Manual (April 2014)

Keep planning

Nearby waterfront guides

Old Marco, Tigertail & Clam Bay

View the local guide directory.

Show sourcesHide sources
  1. Marco Island comprehensive plan and map seriesSource reviewed 2026-10-25
  2. Marco Island bridge and waterway referenceSource reviewed 2026-10-25
  3. Marco Island Seawall Owner’s Manual (April 2014)Source reviewed 2026-10-25
  4. City seawall permit application — Form 31Source reviewed 2026-10-25
  5. Marco Island Building ServicesSource reviewed 2026-10-25
  6. Signed Resolution 26-26: building permit feesSource reviewed 2026-10-25
  7. DEP South District PermittingSource reviewed 2026-10-25
  8. DEP mangrove questionsSource reviewed 2026-10-25
  9. USACE regulatory office locationsSource reviewed 2026-10-25 · official indexed text
  10. Historical city seawall code packet (2018)Source reviewed 2026-10-25
  11. Collier County marine submittal requirementsSource reviewed 2026-10-25 · official indexed text